Other Group Elecnor websites
Construction, assembly, start-up and assisted operation of clusters, gas gathering pipelines, Production Plant at Gavião Preto (EPGVP) and drainage pipe to connect EPGVP to UTG. Additionally, the scope will include the construction of the section of the GVTE gas pipeline, between GVP Cluster 2 and EPGVP, which in the future will connect the GVTE field to EPGVP.
Additional Information: