Gavião Preto Gas Production Plant
Oil & gas
Début
février
2021
Fin
septembre
2023
Localisation
Maranhão (Brasil)
Client
ENEVA
Portée
Consolidation of the basic design, engineering design, supply, shipping, reception and unloading of materials (including those supplied by Eneva).
Caractéristiques

Construction, assembly, start-up and assisted operation of clusters, gas gathering pipelines, Production Plant at Gavião Preto (EPGVP) and drainage pipe to connect EPGVP to UTG. Additionally, the scope will include the construction of the section of the GVTE gas pipeline, between GVP Cluster 2 and EPGVP, which in the future will connect the GVTE field to EPGVP.

Additional Information:

  • Production Plant with a maximum flow of 5 MMNm³/day
  • 77,3 km of 6” ~ 18” pipelines
  • 5 Clusters with a maximum flow of between 250,000 Nm³/day and 750.00 Nm³/day
Projet développé par:
Fermer