Damba Water Supply
Eau
Début
mai
2023
Fin
mai
2024
Localisation
Uige (Angola)
Client
Ministry of Energy and Water (MINEA)
Portée
Rehabilitation and expansion of supply system
Caractéristiques

  • Construction of a water intake system on the River Lussenga
  • Pump house (2+1) with a capacity of 220 m³/h
  • Construction and installation of 3,545 m of HDPE inlet pipeline for untreated water
  • Construction and installation of water treatment plant with a capacity of 220 m³/h
  • Construction of a structurally supported water tank
  • Installation of pump system
  • Installation of HDPE PN10 distribution network
  • Installation of 1,927 household connections
  • Construction of 11 public water fountains